EXAMPLEIllustrative example · fictional restaurant «Sazón de Origen». Not your data: your result is built with YOUR restaurant's.See the assistant →
Sazón de OrigenFictional contemporary Colombian restaurant in Medellín, 2 locations, 6 years in business. Every sample result in the library comes from this same case.
Checklists and Audits

Sample result

Closing Checklist Builder for Restaurants

The owner asked this:"Every night the kitchen closes differently and the next day's opening starts by asking what happened. The last docket comes in at 20:45 and the closing manager arms the alarm at 21:45. I want one kitchen closing sheet, the same for both sites."

① One night's clock: five phases in 35 minutes

The closing clock does not start when the last guest leaves: it starts with the last docket, at 20:45 (Sunday 16:45), the cut-off hour for all three channels. The last main course leaves the pass at 21:00, and that is where the sheet begins. The kitchen is handed over at 21:35 and the closing manager arms the alarm at 21:45.

PhaseStartsMinutesWho signsThe box you cannot skip
1 · What spoils21:0012Cold line and assembly cookHot food is binned and weighed; nothing warm goes into the walk-in
2 · The kitchen's money21:128Cold line and assembly cookWaste in kilos and in COP with its cause
3 · The kitchen premises21:2010Hot line cookGas shut and cold running, with its reading
4 · The stationIn parallel with 1 and 220 per postEach postHot line degreased and raw-food board kept apart
5 · The handover21:305Evening kitchen leadFOR-COC-26 read aloud at handover

The night's hands. From 18:00 to 21:45 each site has 4 people: 2 in the kitchen, 1 on the floor and 1 on the till. Phase 4 runs in parallel with phase 1: cleaning the hot line depends neither on the product nor on the waste, and waiting would cost the night 12 minutes.

What was ruled out: closing off a single list of 40 boxes in a row. With one list, waste and the trout count end up last and the gas gets shut in a hurry at 21:40. The minutes are a proposal: they are adjusted with the real times of the first 7 nights.

② Waste as a number

Whatever gets binned is weighed and measured in kilos and in money. The house reads the menu's average food cost at 34 % and Volume 1 takes it to 32 % in 12 months. The waste ceiling per site and per service day is 41,977 COP: 72,760,000 COP of ingredients a month ÷ 2 sites ÷ 26 days × 3 %.

An ordinary night, filled in (illustrative):

ProductKilosCost (COP)ReasonDecision
Sancocho de tres carnes still hot at close2.024,000S · surplusBinned: it stayed hot
Beans from the bandeja1.59,000S · surplusBinned: it stayed hot
White rice1.03,000S · surplusBinned: it never comes back
House ají0.43,200V · expiredBinned: made fresh every day
Night total4.939,200—Inside the ceiling

That night, repeated at both sites over the 26 days, comes to 2,038,400 COP a month: 0.95 points of food cost and 93 % of the house's whole waste ceiling. The night alone eats almost all the waste allowed.

The lever is not in the close but in the 14:30 decision. Holding hot for the afternoon half of what is held today gives back 1,019,200 COP a month (illustrative), 7.9 % of the 12,840,000 COP gap the goal asks for: raising the operating margin from 8 % to 14 % without raising menu prices.

③ The kitchen's money and the till count

The cash count is not the kitchen's job. The cashier counts it blind and another role checks it, in CHK-CAJ-01. The kitchen has its own count, of product, and its cross-checks with the till:

ItemPoint of saleCountedGap
Trout: opening + received − waste − soldSold in the sales systemPieces in the walk-in at closeMust be 0
Dishes remade or sent backKitchen voids in FOR-CAJ-03Rows E and R of FOR-COC-05Must be 0
Staff meals«Personal» button in the systemPeople on the evening shiftMust be 0
Contingency docketsCharges in FOR-CAJ-07Dockets from the padMust be 0

Why the trout. It is the only signature dish sold by the piece: it is counted in 2 minutes and allows no «more or less». If the gap is always 0 over 14 nights, the count moves to Monday's inventory and one box leaves the sheet.

The house is closed with three signatures, not one. This sheet signs off gas and cold. CHK-CAJ-01 signs off the till gap within 0.5 % of the shift's sales, or explained that night. FOR-GEN-04 is signed by the closing manager with the alarm armed. If CHK-CAJ-01 is not signed by 21:45, the closing manager calls the site manager before arming the alarm; the kitchen does not wait for it.

The full example has 2 more part(s): you see them inside the library, with your account.