Sazón de OrigenFictional contemporary Colombian restaurant in Medellín, 2 locations, 6 years in business. Every sample result in the library comes from this same case.
Quality, Food Safety, Cleaning and Maintenance
Sample result
Restaurant Equipment Maintenance Log and Plan Builder
The owner asked this:«We have two units and this year our fridges broke three times, always on the weekend. We do not even have a list of our equipment.»
① The inventory with criticality · two units
With two units and three refrigeration failures on weekends, the first decision is criticality: A items are the ones that stop sales if they fail on a Friday, and they go first in the preventive plan.
| Code | Equipment | Area | Criticality | Service provider | Warranty until |
|---|---|---|---|---|---|
| S1-FRI-01 | Walk-in cooler | Cold storage | A | Refrigeration technician | 2027-03 |
| S1-FRI-02 | Line fridge | Kitchen | A | Refrigeration technician | expired |
| S1-COC-01 | Griddle | Kitchen | A | Gas technician | box |
| S1-COC-02 | Extraction hood | Kitchen | A | Ventilation technician | box |
| S1-BAR-01 | Ice machine | Bar | B | Refrigeration technician | 2026-12 |
| S1-POS-01 | Point of sale | Cashier | A | Software provider | contract |
The year's three corrective jobs were on A items and in the peak window: the preventive plan starts with refrigeration, at the frequency the technician sets and not one from the internet.
The full example has 1 more part(s): you see them inside the library, with your account.