AI assistant · N5 Complete system
Role Onboarding Plan Builder for Restaurants
Pick the role above and which door the person comes through, and the assistant writes the whole process from accepted offer to day ninety: what must be ready before, day one hour by hour, the first-week ramp, the four gates with their pass mark written beforehand, the authority handover in stretches, and the script to confirm or part ways.
N5Complete system
Several chained pieces you install and operate over time, with their review cadence. It changes how the business runs, not one decision.
◆ This assistant 110 of the 164 published assistants are at this levelIs this for you?
What it does and what you get
- In most restaurants onboarding is a sentence: «just follow them around and pick it up».
- That is not a process, it is the absence of one, and it gets paid for in the first week: the person joining does not know who to ask, learns differently every time depending on who is next to them, and leaves before you have recovered what it cost to bring them in.
- This assistant writes the full process for the role you pick —with an owner, a date and a proof at every step—, and it includes the two stretches almost nobody writes: the week BEFORE day one, the cheapest one and the one that prevents the most resignations, and the four gates at days 7, 30, 60 and 90 with their criterion drafted before the process starts, so that the decision to confirm or part ways stops being a hunch taken on day eighty-nine.
- It is not a course or a welcome booklet: it is the chain of handovers that gets two people joining six months apart to the same place.
What you end up with
The full entry process for the chosen role: the table of what must be ready before day one with its owner and its date counted backwards; day one hour by hour closed with one real task finished; the first-week ramp day by day; the four gates —7, 30, 60 and 90— with their numeric pass mark and their «if they do not pass»; the authority handover in three stretches with a cash cap; the buddy with minutes assigned inside their shift; the post's indicators with a baseline and a ninety-day target; and the schedule with the sum in payroll hours plus the three scripts for the conversation to confirm, extend or part ways, and the verdict on whether the process fits the team you have.
EXAMPLE This is what you getAn example built with Sazón de Origen, the house's fictional restaurant.Not your data: your result is built with YOUR restaurant's.See the full example →Sample result
The owner asked this: «A new server starts on Monday. The last one lasted five weeks and left without saying why. We are 14 in the dining room across two sites, the rush is 12:30 to 2:30 and 7 to 9. I need the whole process, not a welcome talk.»
The week before is what decides. Every line has an owner named by role, a backward date and a signal that it is done.
| What | Owner | When | Signal it is done |
|---|---|---|---|
| Contract signed and enrolment filed | Administrator | T-7 | Filing number in the folder |
| Uniform ordered in their size, plus a spare apron | Service captain | T-7 | Named bag in the locker |
| Till login created with a server profile | Administrator | T-3 | They log in and ring a test order |
| Locker assigned and padlock handed over | Service captain | T-3 | Locker number written on the card |
| Buddy confirmed: Marcela, 20 min per shift | Floor manager | T-3 | Marcela has it in her Monday shift |
| Message to the team group: who is arriving, to do what, with whom | Floor manager | T-1 | Message sent, not «I'll say it Monday» |
| First-week rota printed and pinned in the office | Service captain | T-1 | It is on the wall |
Enrolment has a deadline of its own and goes before the first shift; it is not left to day one. Figures and names illustrative.
Outside the rush —in at 9:30, out before 12:30— and closed with one real task finished.
| Time | What happens | With whom |
|---|---|---|
| 9:30 | The floor manager receives them at the door, not in the kitchen. Locker, uniform, where and when they eat | Floor manager |
| 9:50 | The house promise through an example from yesterday's shift, not a line off a wall: table 7 asked to swap the side and what was done | Floor manager |
| 10:15 | Walkthrough: stations, toilets, stores, fire exit, where everything lives | Marcela (buddy) |
| 10:45 | The menu in hand: 8 dishes, what they are really called and their 2 allergens | Head chef |
| 11:30 | Till: opens their profile, rings 3 test orders, one with a modifier | Marcela |
| 12:00 | Closing task: sets 6 tables in section 2 and leaves them ready for the rush | Alone, checked by the captain |
| 12:20 | End of day: what surprised you. Written down verbatim | Floor manager |
Day one is measured by the section that got set, not by what they were told.
| Day | Watches | Accompanied | Alone | Does not touch yet |
|---|---|---|---|---|
| 2 | The full pass through the rush | Takes orders with Marcela beside them | Setting up and drinks | Payment, complaints |
| 3 | — | 2 tables in section 2 | Drinks and desserts | Payment, complaints |
| 4 | — | 3 tables | Starter and main | Complaints |
| 5 | — | 4 tables in the rush | Payment, supervised | Comps |
| 6 | — | Full section 2 off-peak | Payment | Comps |
| 7 | — | Section 2 in the rush, Marcela in sight | Everything but comps | Comps |
By day seven they cover 60 % of a normal shift. And that day the seven-day gate opens: fifteen minutes, two fixed questions —what surprised you and what do you still not understand—. That is where most early resignations are decided, and where they can still be prevented.
Illustrative example generated with a fictional restaurant. Not a promise of results, not a client case.
This is 3 of 5 parts. Behind the wall are the four pieces that make this a process and not a welcome: the four gates with their pass mark written before it starts, authority handed over in stretches with its cash cap, the verdict on whether it fits the team you have, and the three scripts for the 90-day conversation.
See the full example — free accountWorks with these AIs
How to use it
Which of your data it uses
This assistant works with 15 of the 23 fields in «My Restaurant», among them Restaurant name, Business type and Cuisine or concept. It does not ask out of curiosity: these are what make the answer speak about YOUR scale instead of an industry average — the same calculation on a business of another size returns a number you cannot decide with. You fill them once and they apply across the library, so the second assistant you open already starts with them in place. Whatever you leave blank, the assistant asks for one thing at a time instead of inventing it, and says so before answering, so you know what it is working from.
Always up to date
Every assistant carries a visible version and date. When an AI changes how it works, the assistant's version goes up and you see what changed.
v1.0.02026-08-31Commissioned by Diego: «an onboarding process builder for a restaurant role with the detailed, professional, expert onboarding process [...] using the same roles as the role manual builder». Born by merging the ten onboarding titles in c23 —process architect, induction plan, induction programme by role, welcome booklet, onboarding checklist, first-day checklist, first-week plan and the 30, 60 and 90-day plans—, which are not ten tools but the STRETCHES of one process: splitting it would mean selling in pieces the very thing that only works whole. It uses the SAME `cargo` axis and scale as the Role Manual (MPV-0616) so the two pieces fit, and the `como_entra` axis is born with it. Border declared with the Training Programme (MPV-1127): content with its test goes there, the process with its owner, its date and its gate goes here. The id is NOT new: the catalogue had already given MPV-0665 to this title, and ids are immutable. It sat in state «absorbed into MPV-1127», and that absorption is corrected here with its reason: the Training Programme's merge note listed the onboarding architect among what it absorbed, and that was read too broadly. Coming back with it —because they are blocks of THIS process and not content with a test— are the welcome booklet (MPV-0668), the onboarding checklist (MPV-0669) and the first-day checklist (MPV-0670); and the four plans still in the pipeline are merged here: first week (MPV-0671) and 30, 60 and 90 days (MPV-0672 to MPV-0674). The induction plan and programme (MPV-0666 and MPV-0667) STAY with the Training Programme: those really are content with a test. RENAMED at birth by its own gate: `motor/nombres.py` flagged it red —«names no concrete object from the vocabulary»— and it was right. «Process» is not an object the client receives; the PLAN is, and it is also the shape the card declares. The slug stays as it was, which is what the house requires when a label changes.v1.0.12026-09-21The English body said «carry on with a flagged assumption» where the house doctrine says «continue with a marked assumption». Same instruction, different words — and that phrase is not prose: it is what the gate counts to check that BOTH language surfaces say the same thing. Fixed by exact substitution, nothing else moved.More assistants in this category
Pick the role above, how long the session runs and how often it repeats, and the assistant builds THAT deck: a…
N5 · Complete systemYou pick the stage and the role, and the assistant designs training backwards: the test you can fail first, th…
Included in the always-growing library
Access to every published assistant, adapted to your AI and personalised with your restaurant's data, updates included.